How to prepare CAD plans for NBN pit and pipe design

What to send your designer so the design is right first time, and the missing details that most often slow a job down.

Reviewed 14 October 2026

In short: send an AutoCAD DWG of the current subdivision or site plan, at true scale, showing lot boundaries and numbers, roads and kerbs, driveways, existing services and the stage boundary. Add the premises count and your NBN application reference if you have one. A clean, complete DWG is the single biggest factor in a two-week turnaround.

The checklist

Why DWG beats PDF

A pit and pipe design is measured against lot boundaries, kerbs and transformers to the nearest few hundred millimetres. In a DWG every line has a true position, so service drop lengths and pit clearances can be checked exactly. A PDF has to be traced, which takes longer and adds risk. PDF is fine for small sites when it is all you have, and for small developments of up to 20 premises NBN accepts the final design as a PDF.

Tidy the file before you send it

Details that are most often missing

Across more than 300 developments, the same gaps come up again and again:

How to send it

Put a share link to the files (OneDrive, Google Drive, Dropbox or similar) in the quote form, or ask and we will send you an upload link. Files are kept only as long as the job needs them. See our privacy policy.

CAD plan questions

Can I send a PDF instead of CAD?

Yes for small sites, but a DWG is faster and more accurate because every line has a true position. Our two-week turnaround runs from receiving complete CAD plans.

Do I need NBN's AutoCAD template?

No. Send your plans in any normal DWG and we prepare the NBN design. NBN's drafting tool is optional for small developments of up to 20 premises.

What if my plans are still changing?

Send the latest version and tell us what may change. One client revision is included in the price.