NBN pit and pipe guides
Plain-English guides for developers, builders and civil firms working through NBN's new developments process.
Updated 14 October 2026
These guides summarise NBN's published standards and our experience across more than 300 developments. They are general guidance, not a substitute for NBN's current standards, which we check before every design.
How the NBN new developments process works
Every step from design to NBN's Certificate of Practical Completion, and where projects lose time.
NBN for a duplex or small subdivision: what to sort before design
Eight things to sort before NBN design on a duplex, triplex or subdivision of up to about 20 lots.
SDU or MDU: which NBN design does your development need?
Subdivisions, duplexes, townhouses, super lots and apartments, and the rules for each.
NBN pits and conduit: a plain guide for developers
Pit types, conduit sizes, NBN's pit capacity table, clearances, bends and depth of cover.
How to prepare CAD plans for NBN pit and pipe design
A checklist for your DWG plans, and the missing details that slow jobs down.
What's in an NBN pit and pipe design package
The drawings and files you receive, what you upload to NBN, revisions, and exclusions.
How long does NBN pit and pipe design take?
Our two-week turnaround, what affects it, and NBN's stages after design.